TAMPA tech day / MEET with SN00P & the gang .....
it will take to long to do 3 headlights in a oven and get everything done .. normally takes 2 days with all the prep work painting and drying stuff ... im going to do a headlight retrofit sooner or later
TTT i want a nice size turnout
Registered User
iTrader: (3)
Joined: May 2007
Posts: 4,383
Likes: 27
From: pinellas county FLA, queens N.Y.
1 - SN00P - new coils , front hub replacement , spacer change , camber fix
2 - Evil Wayzz ( Tentative) Rear Camber
3 - Kidcane - rear coil is making noise and I am sure I will find something else
4-iamericgee-coils and whatever else
5- ima-g-rider - sways / s.s. brake lines / brake pads / plugs /oil change,filter
lol yeah alot .
coming to hangout / help out
1 -
2 -
3 -
i have 1 bottle nissan brake fluid would i need to have more that 1 bottle ?whene doing brake lines ?
2 - Evil Wayzz ( Tentative) Rear Camber
3 - Kidcane - rear coil is making noise and I am sure I will find something else
4-iamericgee-coils and whatever else
5- ima-g-rider - sways / s.s. brake lines / brake pads / plugs /oil change,filter
lol yeah alot .
coming to hangout / help out
1 -
2 -
3 -
i have 1 bottle nissan brake fluid would i need to have more that 1 bottle ?whene doing brake lines ?
i wont have the new coils !!!!! they are on 2 weeks back order !!! and lenox is going to Christian for the rear camber and eric cant do anything to his car without my coils off my car ...
any votes on postponing this tech day till my coils come in ?? and ill re edit the front page with a newer date and stuff ....
LMK !!!!!
any votes on postponing this tech day till my coils come in ?? and ill re edit the front page with a newer date and stuff ....
LMK !!!!!






