the generator is scheduled to be back on site tomorrow, but they aren't doing the hookup till july 10th, which is a scheduled power outage for the entire site so we can expand to the building next door we just leased
this isn't something I can get out of, I would MUCH rather be in Chicago with you guys rather than sitting in a server room sweating my a$$ off waiting for power to be restored.
this isn't something I can get out of, I would MUCH rather be in Chicago with you guys rather than sitting in a server room sweating my a$$ off waiting for power to be restored.
#141
#142
1. AC unit on roof used to cool room just fine
2. Added additional data domain with 50 TB of data storage
3. Heat climbed and climbed
4. AC unit on roof cannot keep up, room stays around 80-85
5. Added mini AC unit, keeps room around 78
6. we have a brand new huge liebert system in the room recently installed
7. cannot be activated until 480v transfer switches are in place
8. generator needs installed for lines to be finished hooking up
9. generator is installed on the 10th of july
10. have to miss meet because I'm required to be on site
there you go lol