Layer wait times/ sealant/glaze curing
#1
Layer wait times/ sealant/glaze curing
Nice weather, doing a full detail today!
Normally, i use 4*UPP, cure for 24 hrs, and top with AquaWax. Got in some DWG today and want to check that out but i'm unsure of the curing times needed...
Figured i'd do one coat 4*UPP, 2 DWG, 1 4*UPP, 1 DWG, per some results in another thread. What sort of curing times do i need to wait for these coats?
Normally, i use 4*UPP, cure for 24 hrs, and top with AquaWax. Got in some DWG today and want to check that out but i'm unsure of the curing times needed...
Figured i'd do one coat 4*UPP, 2 DWG, 1 4*UPP, 1 DWG, per some results in another thread. What sort of curing times do i need to wait for these coats?
Thread
Thread Starter
Forum
Replies
Last Post