G35 Greddy TT Project Questions
#122
The following users liked this post:
Phillip_G35 (12-24-2012)
#124
Well, today I go to the shop and took some pics. Everything is going good and next week engine will be started. Fuel system is finished, strut bars mounted, relocation canister done, catch can mounted, wastegates air dumps done, damper belts installed. Down pipes where cuted and welded, don't know why, but they where touching the chassis. They're ready now!
Only things left are gauges, electronic boost controller, turbo timer and tune....
Now the pics:
Only things left are gauges, electronic boost controller, turbo timer and tune....
Now the pics:
The following users liked this post:
Phillip_G35 (01-18-2013)
#129
#130
#131
#133
#135